Gust. Alberts | Metamorphosis – From a “Quick Win” to a “Permanent Win”

Customer References

From a Quick Win to a Permanent Win

Gust. Alberts | Metamorphosis – From a “Quick Win” to a “Permanent Win”

Sustainable Inventory Optimization with DISKOVER

53% Lower Inventory
Optimized Materials Planning
High Product Availability

The Starting Point

Gust. Alberts offers more than 7,000 products for the DIY market. To improve its planning and replenishment processes, the company launched a project to optimize inventory over the long term.

The first goal was to reduce inventory quickly and free up cash. To sustain those gains, the second phase focused on establishing planning and replenishment processes that would keep inventory low while maintaining the required level of product availability.

 

-Herscheid, Germany

-Builders’ Hardware & DIY Products

-More Than 7,000 Items in the Product Range

Making Inventory Reductions Last

A quick inventory reduction had to be followed by measures that would sustain the gains. Excessive or across-the-board cuts could have jeopardized availability for some items and left others overstocked.

The project therefore called for a two-stage approach. The first stage focused on identifying the specific factors driving inventory levels and acting on opportunities for immediate reductions. The second stage called for a systematic, rolling planning and replenishment process to keep inventory at cost-effective levels over the long term.

Inventory Optimization with DISKOVER

Quick Wins Through Simulation

Simulations pinpointed items with significant potential for inventory reduction. The findings guided a review and optimization of safety stock levels, reorder points, lot sizes, open purchase orders, and planned demand figures.

Rolling Optimization of Materials Planning

DISKOVER uses a set of rules to regularly review and automatically adjust the relevant materials planning parameters. These rules take into account factors such as ABC/XYZ classification, product lifecycle stage, material type, and historical consumption.

From Push to Pull

Where appropriate, replenishment shifted from a push approach to a consumption-driven pull strategy. Forecasts and input from sales feed into the rolling planning process.

“Reducing inventory quickly is only the beginning. Lasting results come from making those improvements part of everyday planning and replenishment.”

Gust. Alberts GmbH & Co. KG

Lasting Inventory Reductions with Consistent Product Availability

After about four months, inventory levels had already fallen by more than 13%, while product availability remained stable. The company then achieved further substantial reductions by building those early gains into its long-term planning and replenishment processes.

After Just 9 Months
- % Inventory

After nine months, inventory levels were 53% below baseline, well beyond the original target of around 30%. Product availability was maintained throughout.

With DISKOVER, Gust. Alberts turned a short-term inventory reduction initiative into an ongoing planning process. DISKOVER uses a set of rules to review and adjust materials planning parameters based on item characteristics and consumption patterns. Forecasts and input from sales feed into the planning process, and suitable items are switched from push to pull replenishment. This helps Gust. Alberts sustain lower inventory levels while maintaining the required level of product availability.

About Gust. Alberts GmbH & Co. KG

Gust. Alberts GmbH & Co. KG traces its history back to 1852. It began as a workshop making door bolts in Germany’s Sauerland region and grew into an international provider of systems for retailers, tradespeople, and industrial customers. At the time of the case study, Gust. Alberts employed around 430 people across five locations and offered more than 7,000 products for the DIY market.

FAQ – Frequently Asked Questions

By how much did Gust. Alberts reduce its inventory?

Gust. Alberts reduced its inventory by 53% within nine months while maintaining the required level of product availability. After about four months, inventory had already fallen by more than 13%. The original target was a reduction of around 30%.

Gust. Alberts used DISKOVER simulations to identify items with significant potential for inventory reduction. For those items, the project team reviewed factors such as safety stock levels, reorder points, lot sizes, open purchase orders, and planned demand figures. This helped the team determine what short-term action to take for each item.

How does Gust. Alberts keep inventory at cost-effective levels over the long term?

DISKOVER uses a set of rules to regularly review and automatically adjust materials planning parameters. The rules take into account ABC/XYZ classification, the product lifecycle, material type, and historical consumption. This allows Gust. Alberts to adapt its replenishment decisions as conditions change while keeping the same product availability target.

Gust. Alberts switched suitable items from push to pull replenishment. For these items, actual consumption triggers replenishment. Forecasts and input from sales continue to inform the rolling planning process.