{"id":42727,"date":"2024-04-25T10:41:45","date_gmt":"2024-04-25T08:41:45","guid":{"rendered":"https:\/\/ak-online.de\/2024\/04\/25\/in-a-nutshell-set-up-time\/"},"modified":"2025-02-19T12:26:38","modified_gmt":"2025-02-19T11:26:38","slug":"in-a-nutshell-set-up-time","status":"publish","type":"post","link":"https:\/\/www.ak-online.de\/en\/in-a-nutshell-set-up-time\/","title":{"rendered":"Short and sweet: Set-up time"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"42727\" class=\"elementor elementor-42727 elementor-38833\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3a767b9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3a767b9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-8f7e714\" data-id=\"8f7e714\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-adec096 elementor-widget elementor-widget-text-editor\" data-id=\"adec096\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Set-up time refers to the time required to convert a machine or production line from the manufacture of one product to the manufacture of another.<br \/>\nThis period of time includes preparing the set-up, changing tools, molds or fixtures and adjusting the machine to the new specifications. <\/p>\n<p>The aim is to prepare the machine for the next production run without compromising the quality of the products.<br \/>\nSet-up times are a critical factor in production planning and control, as they directly influence the flexibility and efficiency of production.<br \/>\nReducing set-up times can make a significant contribution to increasing overall equipment effectiveness (OEE) and reducing production costs.  <\/p>\n<p><strong>Our tip:<\/strong><\/p>\n<p>The set-up times can be divided into the following segments: Setup preparation, setup, teardown and, if necessary, setup post-processing.<\/p>\n<p>Setup preparation and setup post-processing are possible at the same time as the ongoing production of the previous or next production order.<br \/>\nThese preparatory and follow-up set-up tasks are called &#8220;external set-up&#8221; because they differ from &#8220;internal set-up&#8221;, which includes the set-up and teardown segments and can only take place during machine downtime. <\/p>\n<p>A precise division of all set-up operations into external and internal set-up is crucial for reducing set-up times.<\/p>\n<p>The distinction between set-up and teardown is also relevant for detailed production planning.<br \/>\nThere, it may even be necessary to record the set-up and teardown times per device, mold or tool so that a detailed planning system can calculate the changeover times from one production order to the next more precisely. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Set-up time refers to the time required to convert a machine or production line from the manufacture of one product to the manufacture of another. This period of time includes preparing the set-up, changing tools, molds or fixtures and adjusting the machine to the new specifications. The aim is to prepare the machine for the<\/p>\n","protected":false},"author":25,"featured_media":51976,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1756,1758],"tags":[2073],"class_list":["post-42727","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-production-manufacturing","category-scm-glossary","tag-ruestzeit-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/42727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/comments?post=42727"}],"version-history":[{"count":0,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/42727\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media\/51976"}],"wp:attachment":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media?parent=42727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/categories?post=42727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/tags?post=42727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}