{"id":35307,"date":"2015-12-14T17:43:02","date_gmt":"2015-12-14T16:43:02","guid":{"rendered":"https:\/\/ak-online.de\/2015\/12\/short-sweet-flow-chart\/"},"modified":"2024-03-17T21:22:57","modified_gmt":"2024-03-17T20:22:57","slug":"short-sweet-flow-chart","status":"publish","type":"post","link":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/","title":{"rendered":"Short &amp; sweet: Flow chart"},"content":{"rendered":"<p>A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in time it was received by the work system under consideration. Accordingly, the outflow curve shows at which point in time which hourly volume has flowed out with the completion of a production order.<br \/>If trend lines are drawn through the resulting staircase diagrams, the vertical distance between the two trend lines shows the average number of hours in the work system. The horizontal distance shows the average throughput time.<\/p>\n<p><strong><!--more-->Our tip:<\/strong><br \/>In practice, there is often a load constellation at different work systems or production areas where the entry and exit end lines run parallel but are a long way apart. On the one hand, such a constellation shows that the work system is not overloaded, as on average as much workload flows out as flows in. On the other hand, the large distance between the lines indicates a long queue at the system. In such cases, throughput time and work in progress can be reduced simply by temporarily increasing the performance of the work system. This can take the form of extra shifts, weekend work or outsourcing production orders.<\/p>\n<figure id=\"attachment_15780\" aria-describedby=\"caption-attachment-15780\" style=\"width: 557px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.ak-online.de\/\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm.png\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-15780 \" src=\"https:\/\/www.ak-online.de\/\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm-1024x685.png\" alt=\"Receipt and issue curve and the resulting throughput time and inventory\" width=\"557\" height=\"372\" srcset=\"https:\/\/www.ak-online.de\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm-1024x685.png 1024w, https:\/\/www.ak-online.de\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm-600x401.png 600w, https:\/\/www.ak-online.de\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm-300x201.png 300w, https:\/\/www.ak-online.de\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm-768x514.png 768w, https:\/\/www.ak-online.de\/wp-content\/uploads\/2015\/12\/Durchlaufdiagramm.png 1332w\" sizes=\"(max-width: 557px) 100vw, 557px\" \/><\/a><figcaption id=\"caption-attachment-15780\" class=\"wp-caption-text\">Receipt and issue curve and the resulting throughput time and inventory<\/figcaption><\/figure>\n<p><strong>Further information on this topic can be found here:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/www.ak-online.de\/de\/2013\/05\/harmonie-reduziert-durchlaufzeiten-in-der-goldmanufaktur\/\" target=\"_blank\" rel=\"noopener\">Harmony reduces throughput times in the gold manufactory<\/a><\/li>\n<li><a href=\"https:\/\/www.ak-online.de\/de\/2012\/12\/produktionskennlinien\/\" target=\"_blank\" rel=\"noopener\">Short &amp; sweet: Production characteristics<\/a><\/li>\n<li><a href=\"https:\/\/www.ak-online.de\/de\/2012\/06\/staus-in-der-fertigung-umfahren\/\" target=\"_blank\" rel=\"noopener\">Avoiding traffic jams in production<\/a><\/li>\n<\/ul>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in<\/p>\n","protected":false},"author":25,"featured_media":30244,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1721,1722,1758],"tags":[2001,1725],"class_list":["post-35307","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-planning-disposition","category-production-control","category-scm-glossary","tag-flow-chart","tag-stock"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.6.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Prof. Dr. Andreas Kemmner\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.6.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Abels &amp; Kemmner - Supply chain optimisation | Abels &amp; Kemmner Management Consultancy\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Short &amp; sweet: Flow chart | Abels &amp; Kemmner - Supply chain optimisation\" \/>\n\t\t<meta property=\"og:description\" content=\"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-12-14T16:43:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-17T20:22:57+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Short &amp; sweet: Flow chart | Abels &amp; Kemmner - Supply chain optimisation\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#blogposting\",\"name\":\"Short & sweet: Flow chart | Abels & Kemmner - Supply chain optimisation\",\"headline\":\"Short &amp; sweet: Flow chart\",\"author\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/author\\\/kemmner\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/posts-2-13.jpg\",\"width\":1140,\"height\":855},\"datePublished\":\"2015-12-14T17:43:02+01:00\",\"dateModified\":\"2024-03-17T21:22:57+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#webpage\"},\"articleSection\":\"Planning &amp; disposition, Production control, SCM Glossary, Flow chart, Stock, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/category\\\/planning-disposition\\\/#listItem\",\"name\":\"Planning &amp; disposition\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/category\\\/planning-disposition\\\/#listItem\",\"position\":2,\"name\":\"Planning &amp; disposition\",\"item\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/category\\\/planning-disposition\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#listItem\",\"name\":\"Short &amp; sweet: Flow chart\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#listItem\",\"position\":3,\"name\":\"Short &amp; sweet: Flow chart\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/category\\\/planning-disposition\\\/#listItem\",\"name\":\"Planning &amp; disposition\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#organization\",\"name\":\"Abels & Kemmner - Supply chain optimisation\",\"description\":\"Abels & Kemmner Management Consultancy\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/\",\"telephone\":\"+49240795650\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/Logo-mit-Claimv2.png\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#organizationLogo\",\"width\":600,\"height\":195},\"image\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCMOyLX-7Q_zpnACCykNdMRw\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/abels-kemmner-gmbh\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/author\\\/kemmner\\\/#author\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/author\\\/kemmner\\\/\",\"name\":\"Prof. Dr. Andreas Kemmner\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/prof-dr-andreas-kemmner_avatar-96x96.jpg\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#webpage\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/\",\"name\":\"Short & sweet: Flow chart | Abels & Kemmner - Supply chain optimisation\",\"description\":\"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/author\\\/kemmner\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/author\\\/kemmner\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/posts-2-13.jpg\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#mainImage\",\"width\":1140,\"height\":855},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/short-sweet-flow-chart\\\/#mainImage\"},\"datePublished\":\"2015-12-14T17:43:02+01:00\",\"dateModified\":\"2024-03-17T21:22:57+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/\",\"name\":\"Abels & Kemmner - Supply chain optimisation\",\"description\":\"Abels & Kemmner Management Consultancy\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ak-online.de\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Short &amp; sweet: Flow chart | Abels &amp; Kemmner - Supply chain optimisation<\/title>\n\n","aioseo_head_json":{"title":"Short & sweet: Flow chart | Abels & Kemmner - Supply chain optimisation","description":"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in","canonical_url":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#blogposting","name":"Short & sweet: Flow chart | Abels & Kemmner - Supply chain optimisation","headline":"Short &amp; sweet: Flow chart","author":{"@id":"https:\/\/www.ak-online.de\/en\/author\/kemmner\/#author"},"publisher":{"@id":"https:\/\/www.ak-online.de\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.ak-online.de\/wp-content\/uploads\/2023\/08\/posts-2-13.jpg","width":1140,"height":855},"datePublished":"2015-12-14T17:43:02+01:00","dateModified":"2024-03-17T21:22:57+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#webpage"},"isPartOf":{"@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#webpage"},"articleSection":"Planning &amp; disposition, Production control, SCM Glossary, Flow chart, Stock, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.ak-online.de\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/#listItem","name":"Planning &amp; disposition"}},{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/#listItem","position":2,"name":"Planning &amp; disposition","item":"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#listItem","name":"Short &amp; sweet: Flow chart"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#listItem","position":3,"name":"Short &amp; sweet: Flow chart","previousItem":{"@type":"ListItem","@id":"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/#listItem","name":"Planning &amp; disposition"}}]},{"@type":"Organization","@id":"https:\/\/www.ak-online.de\/en\/#organization","name":"Abels & Kemmner - Supply chain optimisation","description":"Abels & Kemmner Management Consultancy","url":"https:\/\/www.ak-online.de\/en\/","telephone":"+49240795650","logo":{"@type":"ImageObject","url":"https:\/\/www.ak-online.de\/wp-content\/uploads\/2023\/08\/Logo-mit-Claimv2.png","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#organizationLogo","width":600,"height":195},"image":{"@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/channel\/UCMOyLX-7Q_zpnACCykNdMRw","https:\/\/de.linkedin.com\/company\/abels-kemmner-gmbh"]},{"@type":"Person","@id":"https:\/\/www.ak-online.de\/en\/author\/kemmner\/#author","url":"https:\/\/www.ak-online.de\/en\/author\/kemmner\/","name":"Prof. Dr. Andreas Kemmner","image":{"@type":"ImageObject","url":"https:\/\/www.ak-online.de\/wp-content\/uploads\/2026\/03\/prof-dr-andreas-kemmner_avatar-96x96.jpg"}},{"@type":"WebPage","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#webpage","url":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/","name":"Short & sweet: Flow chart | Abels & Kemmner - Supply chain optimisation","description":"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.ak-online.de\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#breadcrumblist"},"author":{"@id":"https:\/\/www.ak-online.de\/en\/author\/kemmner\/#author"},"creator":{"@id":"https:\/\/www.ak-online.de\/en\/author\/kemmner\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.ak-online.de\/wp-content\/uploads\/2023\/08\/posts-2-13.jpg","@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#mainImage","width":1140,"height":855},"primaryImageOfPage":{"@id":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/#mainImage"},"datePublished":"2015-12-14T17:43:02+01:00","dateModified":"2024-03-17T21:22:57+01:00"},{"@type":"WebSite","@id":"https:\/\/www.ak-online.de\/en\/#website","url":"https:\/\/www.ak-online.de\/en\/","name":"Abels & Kemmner - Supply chain optimisation","description":"Abels & Kemmner Management Consultancy","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.ak-online.de\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Abels &amp; Kemmner - Supply chain optimisation | Abels &amp; Kemmner Management Consultancy","og:type":"article","og:title":"Short &amp; sweet: Flow chart | Abels &amp; Kemmner - Supply chain optimisation","og:description":"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in","og:url":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/","article:published_time":"2015-12-14T16:43:02+00:00","article:modified_time":"2024-03-17T20:22:57+00:00","twitter:card":"summary_large_image","twitter:title":"Short &amp; sweet: Flow chart | Abels &amp; Kemmner - Supply chain optimisation","twitter:description":"A throughput diagram can be used to monitor the load situation of a production system, a production area or the entire production process. A flow chart always consists of an entry curve and an exit curve. The receipt curve shows the cumulative order volume, measured in hours for setup and production, at which point in"},"aioseo_meta_data":{"post_id":"35307","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-21 17:07:03","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":null,"ai":null,"created":"2025-04-11 10:46:27","updated":"2025-12-03 10:31:54"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.ak-online.de\/en\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/\" title=\"Planning &amp; disposition\">Planning &amp; disposition<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tShort &amp; sweet: Flow chart\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.ak-online.de\/en\/"},{"label":"Planning &amp; disposition","link":"https:\/\/www.ak-online.de\/en\/category\/planning-disposition\/"},{"label":"Short &amp; sweet: Flow chart","link":"https:\/\/www.ak-online.de\/en\/short-sweet-flow-chart\/"}],"_links":{"self":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/35307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/comments?post=35307"}],"version-history":[{"count":0,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/35307\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media\/30244"}],"wp:attachment":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media?parent=35307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/categories?post=35307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/tags?post=35307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}