{"id":35245,"date":"2019-12-18T11:20:32","date_gmt":"2019-12-18T10:20:32","guid":{"rendered":"https:\/\/ak-online.de\/2019\/12\/in-a-nutshell-safety-time\/"},"modified":"2019-12-18T11:20:32","modified_gmt":"2019-12-18T10:20:32","slug":"in-a-nutshell-safety-time","status":"publish","type":"post","link":"https:\/\/www.ak-online.de\/en\/in-a-nutshell-safety-time\/","title":{"rendered":"In a nutshell: Safety time"},"content":{"rendered":"<p>Safety time is a key control factor in material procurement and production control. The safety time is used to determine the period of time by which a demand should be covered before its actual demand date; it is therefore used to improve the security of supply. A safety time of three days, for example, means that the material delivery or the production order receives a date as the target delivery date that is three days before the actual requirement.<\/p>\n<p><strong>Our tip:<\/strong><\/p>\n<p>The safety time is an elegant method of building up a procurement safety stock in procurement in the event of fluctuating delivery times for a material. In contrast to an ongoing physical procurement safety stock, as calculated using the Bower-Sox formula, for example, the application of the safety time only results in a stock if the supplier delivers on time. All in all, this means that you can manage with a lower safety stock on the procurement side.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Safety time is a key control factor in material procurement and production control. The safety time is used to determine the period of time by which a demand should be covered before its actual demand date; it is therefore used to improve the security of supply. A safety time of three days, for example, means<\/p>\n","protected":false},"author":25,"featured_media":30230,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1866,1769,1758],"tags":[],"class_list":["post-35245","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-material-disposition","category-purchasing-supplier-management","category-scm-glossary"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/35245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/comments?post=35245"}],"version-history":[{"count":0,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/posts\/35245\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media\/30230"}],"wp:attachment":[{"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/media?parent=35245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/categories?post=35245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ak-online.de\/en\/wp-json\/wp\/v2\/tags?post=35245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}